Laqeeni guide · Riyadh

Before you sign with a renovation contractor in Riyadh

Renovating an old home or finishing an apartment? Before you sign with anyone, read this: what to plan first, why a written contract and payments in stages matter, and the questions that stop a job dragging on and costing more.

Before you call any contractor

Planning first saves you money and time.

Plan each room

Decide exactly what you want in each room before you call any contractor.

Budget plus a reserve

Keep 10–15% extra for surprises, especially in older homes.

Photograph the home

Photograph each room as it is now. Useful for quotes and for comparing later.

Who buys the materials?

Decide at the start. If the contractor does, you need to name the grade for each material.

📝 Always: a written contract with every item in it, and payments in stages as the work is done. Never pay all, or most, of the money upfront.

Common renovation mistakes

You can avoid most of them from the start.

A contract without details

"Full finishing" without naming the materials invites disputes. Every item should be written down.

Paying a lot up front

Better to pay in stages as work is completed, not most of the money on day one.

Covering wiring before checking

Check the electrics and plumbing before walls are closed with tiles or gypsum. Fixing it later costs a lot.

Skipping waterproofing

Bathrooms, kitchens and the roof need proper waterproofing before tiling.

No handover date

Without a written deadline, work can drag on for months. Write the timeline, and a late penalty if you can.

Changing your mind mid-way

Every change after work starts adds cost and time. Finish the design and choices before starting.

Light refresh or full renovation: what's different

The size of the job changes the time, the price and who you need.

Light refresh

Paint, tiles and simple updates.

  • Can take weeks.
  • Ask for a detailed quote for each item.
  • Ask about the guarantee on the work.

Full renovation

Including new wiring and plumbing.

  • Can take two months or more.
  • A written bill of quantities and payments by stage.
  • If you have doubts about the structure or foundations, ask an engineer first.

During the work

Visit the site often

Check the work regularly and photograph each stage, especially before wiring is covered.

Everything in writing

Any change or new agreement: write it on WhatsApp with the price.

Pay after each stage

Pay once you've seen the stage finished, not before.

Last payment after inspection

Keep the final payment until after handover and inspection.

Questions to ask a renovation contractor

Ask before you sign. A good contractor won't mind.

  1. Will you write a bill of quantities?

    Every item with quantity, price, material and grade, not just a total.

  2. How will payments work?

    Split payment into stages by progress, with the last payment after handover and inspection.

  3. Do you have a commercial registration?

    Make sure the contractor has one, and ask for a copy.

  4. What's the timeline and guarantee?

    A written timeline, and a guarantee on the work (e.g. a year on leaks and cracks).

  5. Who buys the materials?

    The contractor or you? If the contractor, name the type and grade for each material.

  6. Can I visit a project you finished?

    Visit a project they finished, and speak to the owner if you can.

Warning signs

One sign on its own doesn't prove anything, but take care if you see them.

Wants most of the money upfront

Payments should follow progress. Think twice.

A total with no breakdown

"Full finishing" without a bill of quantities invites disputes.

Won't put a timeline in writing

Without a written deadline, work can drag on for months.

Closes walls quickly

Before you've seen the wiring and plumbing. Ask to check them first.

Rough guide

Rough prices (a guide only)

Rough prices per square metre, including materials and labour. Use them to spot a quote that's way off, not as fixed prices. The price varies a lot with the finishing level, materials and the state of the home.

ServiceRough price
Economy finishing (per m²)SAR 500 – 800
Mid-range finishing (per m²)SAR 900 – 1,400
High-end finishing (per m²)SAR 1,600 – 2,500
Whole-home renovation (real Riyadh jobs)SAR 12,000 – 23,000 and up

💡 Renovation cost depends more on the state of the home than its size. Ask several contractors to visit and write a detailed bill of quantities.

🧾 Compare quotes line by line (electrics, plumbing, tiles, paint, gypsum), not just the total. A cheap quote sometimes leaves things out.

A rough guide from 5 sources in Saudi Arabia (October 2026), including real jobs by Riyadh customers and finishing companies' price guides. The final price is agreed between you and the contractor. Laqeeni doesn't set prices or take commission.

Common questions

How long does renovating an apartment take?

Depends on the work. A light refresh (paint and tiles) can take weeks; a full renovation with new wiring and plumbing can take two months or more.

Renovate or demolish and rebuild?

If the structure is sound, renovating is usually much cheaper. If there are problems with the foundations or concrete, ask an engineer before deciding.

Does Laqeeni take commission?

No. Laqeeni is a directory that connects you with the contractor directly. You agree and pay between you.

Last updated: October 2026

Your renovation checklist

Print it, or save it on your phone for next time.

Before you call

Before you sign

During the work

laqeeni.sa/en/renovation-riyadh/

Share on WhatsApp

Directory launching soon – get notified on WhatsApp

We're signing up renovation and finishing contractors across Riyadh now. When the directory opens, you'll be able to contact them directly, with no commission. Send us a WhatsApp and we'll let you know.

Get notified on WhatsApp

Are you a tradesman? Join Laqeeni free