Laqeeni guide · Riyadh

Before you hire a tiler in Riyadh

Tiling a floor, redoing a bathroom, or fitting porcelain? Before you agree with anyone, read this: what to prepare, the difference between labour-only and all-in prices, and the questions that keep your tiles level and lasting.

Before you call anyone

Get these ready before you ask for a price, so you can compare quotes properly.

Measure the area

Length × width of each room. For a bathroom, add the walls.

Labour only or all-in?

Decide: will you buy the tiles and materials, or the tiler?

10% extra

If you're buying the tiles, get about 10% extra, all from the same batch.

Old tiles?

Tell the tiler if old tiles need removing or the floor levelling. It changes the price.

Common problems and what usually causes them

Know them before, so you can check for them during the job.

A hollow sound when you tap a tile

The tile isn't fully bedded (there's a gap under it). It may crack over time, so it's best relaid.

Uneven tiles or raised edges

The floor wasn't levelled or no levelling tools were used. Check before the adhesive sets.

Water stands on the bathroom floor

The slope towards the drain is wrong. It must be set during tiling; fixing it later is hard.

Grout goes black or cracks

Cheap grout or too much water. Water-resistant grout is better for bathrooms and kitchens.

A tile cracked or broke

Usually a gap underneath, or something heavy fell on it. Keep spare tiles of the same type to replace it.

Tile colour differs between boxes

Tiles from different batches. Open the boxes and compare before fitting, and buy the full amount at once.

Labour only or all-in: what's different

The price difference is big, so compare like with like.

Labour only

You buy the tiles and materials.

  • Ask the tiler exactly what's needed (adhesive, cement, grout).
  • Buy from the same batch.
  • Compare only with other labour-only quotes.

All-in

The tiler supplies everything.

  • Get the tile type and materials in writing.
  • See the tiles before fitting.
  • Compare only with other all-in quotes.

Make your tiles last

Don't walk on them too soon

Let the adhesive set for as long as the tiler says before walking on it or moving furniture back.

Use the right cleaner

Very strong products damage the grout and the shine. Use a cleaner suited to the tile.

Keep spare tiles

A box or a few tiles of the same type will save you if one breaks.

Waterproof the bathroom

Before tiling a bathroom, make sure the waterproofing under the tiles is done properly.

Questions to ask a tiler

Ask before any work starts. A good tiler won't mind.

  1. Labour only or all-in?

    Agree clearly, and get it in writing with the price per m².

  2. Shall we measure together?

    Measure together before and after the job, especially if you're paying per m².

  3. Is preparation and removal included?

    Is removing old tiles and levelling included, or extra? Who takes away the rubble?

  4. Will you show me the bathroom slope?

    Ask them to show you the slope towards the drain before they finish the bathroom.

  5. How many days?

    How long will it take, and when can you walk on the tiles?

  6. Can I see photos of past jobs?

    Look at real past work, and pay attention to the grout lines and edges in the photos.

Warning signs of a bad job

One sign on its own doesn't prove anything, but take care if you see them.

Tiles that sound hollow

Tap the tiles before you pay. Hollow ones need relaying.

Water stands in the bathroom

The slope is wrong. Ask them to fix it before they finish.

Mixes boxes from different batches

Without comparing the colour. Ask them to open and compare first.

Won't write labour-only or all-in

If they won't write down what's in the price, think twice.

Rough guide

Rough prices (a guide only)

Most tilers charge per square metre. Careful: there's a "labour only" price (you buy the materials) and an "all-in" price, and the difference is big. Use these to spot a quote that's way off, not as fixed prices.

ServiceRough price
Labour only, standard ceramicFrom SAR 16 – 20 per m²
Labour only, porcelain (large tiles)SAR 50 – 80 per m²
All-in, standard ceramic floorSAR 40 – 180 per m²
Floor preparation (levelling or removing old tiles)Adds SAR 15 – 30 per m²

💡 When comparing quotes, make sure they're the same kind: labour only or all-in? Do they include adhesive, cement and grout?

🧮 Buy about 10% extra tiles for cuts and breakage, all from the same batch so the colour matches.

A rough guide from 5 sources in Saudi Arabia (October 2026), including Riyadh tilers' ads and price guides. Sources sometimes mix up material and fitting prices, so the ranges are wide. The final price is agreed between you and the tiler. Laqeeni doesn't set prices or take commission.

Common questions

Ceramic or porcelain?

Porcelain is stronger and harder-wearing, good for floors and busy areas. Ceramic is cheaper and fine for walls and lighter areas.

How long does tiling a bathroom take?

A normal bathroom usually takes 3 to 5 days, including removing the old tiles, waterproofing, tiling and grouting.

Does Laqeeni take commission?

No. Laqeeni is a directory that connects you with the tiler directly. You agree and pay between you.

Last updated: October 2026

Your tiling checklist

Print it, or save it on your phone for next time.

Before you call

Before work starts

Before you pay

laqeeni.sa/en/tiling-riyadh/

Share on WhatsApp

Directory launching soon – get notified on WhatsApp

We're signing up tilers across Riyadh now. When the directory opens, you'll be able to contact them directly, with no commission. Send us a WhatsApp and we'll let you know.

Get notified on WhatsApp

Are you a tradesman? Join Laqeeni free